Split bobbins ZMSB

    Split bobbins ZMSB

    Split bobbins ZMSB
    Rapid deployment and removal of demag cable for field nulling

    Zeromag ZM100A is used world wide by leading welding companies to overcome arc blow. When working with pipes this process requires demag cable to be wound, typically 20 to 25 turns. Winding can be a slow process typically occurring after fit-up. Split bobbins offer the opportunity to wind the cable off line;  bobbins and cable are then passed over the pipe end prior fit-up. Often these are used one either side of the weld preparation. Eye-bolts on  the bobbin facilitate hoisting of the cable and bobbin assembly.

    Split bobbins ZMSB

     

    Once welding is complete cable can be quickly pulled off the bobbin. Thumb nuts are then loosened and the bobbin can be split for removal from the pipe. The process is then repeated for further joints.

    Split bobbins are aluminium construction and manufactured to pipe size, specified at time of order.

    Split bobbins ZMSB

    Split bobbins ZMSB

    No reviews
    Product added to wishlist
    Product added to compare.

    Ši svetainė naudoja slapukus

    Mes ir mūsų partneriai naudojame tokias technologijas kaip slapukai ir apdorojame asmens duomenis, pvz., IP adresą arba naršyklės informaciją, siekdami suasmeninti jums rodomą reklamą. Tai padeda mums rodyti jums aktualesnius skelbimus ir pagerina Jūsų interneto patirtį. Taip pat tai naudojame siekdami išmatuoti rezultatus arba suderinti savo svetainės turinį. Kadangi vertiname Jūsų privatumą, prašome Jūsų leidimo naudoti šias technologijas.